"Riff-Raff" the Bolger designed Micro and I doing a little garage sailing early on during its construction. As of July 26 2001 she's about ready to turn over and start interior finish. Planned launch was 1 July, 2001.
I didn't make it. More to follow.
Progress to 16 Sept., 2002.
Riff-Raff in June 2002, just got the winter cover off and about to be moved inside for more work. The bottom is doubled up 3/8" ply that forms a 3/4' thick, and very solid bottom.
Riff-Raff's innards after a long winter's rest. We'll be adding deck beams, a self draining cockpit (similar to the AS 29'S) and covering the cabin soon.
Cockpit framing for self draining foot well. Beer can is ONLY to show scale.
Foot well planked with 1/2" plywood. Scuppers cut in bulkhead D, old air vent to be filled in.